Open solicitation · city · NJ
West Lawrence Pump Station Bank Stabilization Project
OpenGov · Bid - Prevailing Wage. The project generally consists of embankment stabilization improvements comprised of gabion baskets, gabion mattresses, loose stone riprap, and live staking. The improvements are intended to restabilize the eroded embankments, which are in close proximity to the pumping station. The tributary embankments have eroded to the extent that existing pavement and fencing have been damaged, and accordingly the project also proposes new chain link fencing, perimeter concrete flush curb, and pavement restoration beyond top of bank. It should be noted that the proposed edge of pavement will not extend beyond the existing edge of pavement, and the flush curb will maintain existing site drainage patterns Review the official project, eligibility, response instructions and all addenda before acting.
Verified public facts
What the official source currently shows.
DEE last verified this record on October 30, 2026 at 6:28 AM ET. The government source controls if details change.
- Stage
- Open solicitation
- Status
- Open at last verification
- Notice type
- Bid - Prevailing Wage
- Buyer
- Township of North Brunswick
- Notice reference
- BID26003
- Location
- NJ
- Category
- Plumbing services
- Deadline
- November 17, 2026 at 11:00 AM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Conditional
- Amendments observed
- 0
- Source
- Township of North Brunswick
- The buyer is a local, school, university, airport, or utility organization.
One or more signals align, but important capacity or requirement facts still need review.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step