Open solicitation · state · IA
26-17 Ben850929B (Benton)
Iowa hosted opportunity · Agriculture and Land Stewardship: Completion Dates: Construction: November 1st, 2027 Seeding: December 15, 2027 (Must follow the seeding windows stipulated in Specifications IA CS-006.) This project is for a Breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, CMP water control structure, stoplog storage structure, riprap with concrete grout, TURF reinforcement mat Tyope 5B, s and seeding. This project includes 18,151 cubic yards of earthwork, 1,150 square feet of steel sheetpile, 1,268 linear feet of pipe installation, 668 tons of riprap, 35 tons . Review the official posting, documents, submission instructions, questions, and addenda before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on November 20, 2026 at 1:49 PM ET. The government source controls if details change.
- Stage
- Open solicitation
- Status
- Open at last verification
- Notice type
- Solicitation
- Buyer
- Iowa State Government
- Notice reference
- 26-17 Ben850929B (Benton)
- Location
- IA
- Category
- Other
- Deadline
- December 10, 2026 at 4:00 PM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Unclear
- Amendments observed
- 0
- Source
- Iowa procurement office
- The stored notice does not publish enough safe small-team evidence.
Do not infer fit from missing data. Review the official scope or build a Contract Blueprint before deciding.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step