Open solicitation · city · WA
East Marginal Way S Preservation (FHWA)
OpenGov · Solicitation (Attach a Document) - Construction. Project Description: Project consists of pavement overlay and spot base repairs and rechannelization for a protected bike lane and shared use path. Work includes milling, pavement removal, excavation, concrete and asphalt base repair, asphalt surfacing, curb ramps, sidewalks, drainage, signals, street lighting, signing, striping and landscaping. For the purpose of the Bidder Subcontractor List, this project includes rebar installation and electrical work. Engineer's Estimate: $10,800,000 Project Location: East Marginal Way South from 1st Ave South to Tukwila City Limits. Review the official project, eligibility, response instructions and all addenda before acting.
Verified public facts
What the official source currently shows.
DEE last verified this record on October 15, 2026 at 5:29 PM ET. The government source controls if details change.
- Stage
- Open solicitation
- Status
- Open at last verification
- Notice type
- Solicitation (Attach a Document) - Construction
- Buyer
- City of Seattle
- Notice reference
- PW#2025-057
- Location
- WA
- Category
- Other
- Deadline
- November 18, 2026 at 5:00 PM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Conditional
- Amendments observed
- 0
- Source
- City of Seattle
- The buyer is a local, school, university, airport, or utility organization.
- The scope is in a focused service or supply lane often delivered by smaller teams.
One or more signals align, but important capacity or requirement facts still need review.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step