Current notice · state · GA
Engineering Design Services GDOT PI#0021595 PTC 25-08 SR 141 Sidewalks TAP
Georgia Procurement Registry · Non-State Agency · Peachtree Corners, City Of · Government: city · Category: Construction / Public Works · Purchase type: Non-State Agency · NIGP: 92517 Civil Engineering / 92593 Traffic and Transportation Engineering / 92549 Highways, Streets, Airport Pay-Parking Lots Engineering · Buyer: James Nguyen · jnguyen@peachtreecornersga.gov · City of Peachtree Corners (the Community) is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or organization(s) to provide consultant services for design and construction administration for an approximately 0.50 miles of new sidewalk along SR 141/Peachtree Parkway. The project will close two existing gaps in the City's pedestrian network by connecting sidewalks between Engineering Drive and Scientific Drive, and between Triangle Drive and Peachtree Corners Circle. The project will also include associated improvements such as grading, curb and gutter construction, sod replacement, and safety rail installation where warranted. This Request for Qualifications (RFQ) seeks to · Review the official posting, documents, response instructions, and updates before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on September 10, 2026 at 10:52 AM ET. The government source controls if details change.
- Stage
- Current notice
- Status
- Current response window open
- Notice type
- Non-State Agency
- Buyer
- Peachtree Corners, City Of
- Notice reference
- PE-66790-NONST-2027-000000032
- Location
- GA
- Category
- Consulting & professional services
- Response due
- October 9, 2026 at 4:00 PM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Unclear
- Amendments observed
- 0
- Source
- Georgia procurement office
- The stored notice does not publish enough safe small-team evidence.
Do not infer fit from missing data. Review the official scope or build a Contract Blueprint before deciding.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step