Open solicitation · state · IA
26-10 Car833409A (Carroll) RFB
Iowa hosted opportunity · Agriculture and Land Stewardship: In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 19,861 total cubic yards of earthwork, 835 linear feet of pipe installation, 29 tons of riprap, installation of a Modified SW-513 concrete outlet structure, lift station consisting of a SW-401 concrete structure, solar pump system and 2.4 acres of seeding. The estimated construction cost. Review the official posting, documents, submission instructions, questions, and addenda before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on October 1, 2026 at 9:44 PM ET. The government source controls if details change.
- Stage
- Open solicitation
- Status
- Open at last verification
- Notice type
- Solicitation
- Buyer
- Iowa State Government
- Notice reference
- 26-10 Car833409A (Carroll) Wetland
- Location
- IA
- Category
- Other
- Deadline
- October 27, 2026 at 4:00 PM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Unclear
- Amendments observed
- 0
- Source
- Iowa procurement office
- The stored notice does not publish enough safe small-team evidence.
Do not infer fit from missing data. Review the official scope or build a Contract Blueprint before deciding.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step