Current notice · state · GA
2026-PME-12 Camp Creek Outfall Replacement - Phase 1
Georgia Procurement Registry · Non-State Agency · Clayton County Water Authority · Government: county · Category: Construction / Public Works · Purchase type: Non-State Agency · NIGP: 91392 Maintenance and Repair, Water System, Main and Service Line / 91381 Maintenance and Repair, Sewer and Storm Drain, Including Removal / 91345 Construction, Sewer and Storm Drain · Buyer: CCWA PROCUREMENT · ccwa_procurement@ccwa.us · The Clayton County Water Authority (CCWA) intends to contract with an experienced licensed utility contractor to complete the Camp Creek Outfall Replacement ¿ Phase 1 Project. The purpose of the Project is to install approximately 14,453 linear feet of new 36-inch and 30-inch gravity-flow sanitary sewer replacing an existing 30-inch gravity-flow sanitary sewer. Multiple reconnections of smaller existing sewers will be required to complete the work. · Review the official posting, documents, response instructions, and updates before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on September 10, 2026 at 10:52 AM ET. The government source controls if details change.
- Stage
- Current notice
- Status
- Current response window open
- Notice type
- Non-State Agency
- Buyer
- Clayton County Water Authority
- Notice reference
- PE-63125-NONST-2027-000000081
- Location
- GA
- Category
- Other
- Response due
- October 8, 2026 at 3:00 PM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Conditional
- Amendments observed
- 0
- Source
- Georgia procurement office
- The scope is in a focused service or supply lane often delivered by smaller teams.
One or more signals align, but important capacity or requirement facts still need review.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step