Current notice · state · GA
Proposed Phase 2: 20k S.F. Industrial Spec Building
Georgia Procurement Registry · Non-State Agency · Grady County Joint Development Authority · Government: county · Category: Construction / Public Works · Purchase type: Non-State Agency · NIGP: 90921 Building Construction, Industrial, Warehouse, etc. / 91223 Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. / 91336 Construction, Parking Lot and Alley · Buyer: Watkins & Associates, LLC · rosemary@watkinseng.com · Sealed Bids for the construction of the Proposed Phase 2: 20k S.F. Industrial Spec Building will be received, by Grady County Joint Development Authority, at 961 North Broad Street, Cairo, GA 39828, until 10:00 AM, Tuesday, October 20, 2026, local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the Proposed Phase 2: 20k S.F. Industrial Spec Building as shown on the construction drawings. In general, construction consists of a new 20,000 S.F. building shell, loading · Review the official posting, documents, response instructions, and updates before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on September 20, 2026 at 11:29 AM ET. The government source controls if details change.
- Stage
- Current notice
- Status
- Current response window open
- Notice type
- Non-State Agency
- Buyer
- Grady County Joint Development Authority
- Notice reference
- PE-77543-NONST-2026-000000003
- Location
- GA
- Category
- Manufacturing & industrial supplies
- Response due
- October 20, 2026 at 10:00 AM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Unclear
- Amendments observed
- 0
- Source
- Georgia procurement office
- The stored notice does not publish enough safe small-team evidence.
Do not infer fit from missing data. Review the official scope or build a Contract Blueprint before deciding.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step