state opportunity · GA
2027-39
Georgia Procurement Registry · Non-State Agency · Tattnall County Board Of Commissioners · Government: county · Category: Construction / Public Works · Purchase type: Non-State Agency · NIGP: 91276 Striping: Streets, Parking Facilities, Lane Divisions, Paint, etc. / 91395 Paving and Resurfacing, Highway and Road · Buyer: County Project Consultant Dennis Odom · engineer@tattnallcountyga.gov · This project consists of the construction of approximately 0.67 miles of new roadway along Magnolia Road in Tattnall County, generally following the existing unpaved alignment. The proposed roadway provides improved access to adjacent residential and agricultural properties and establishes a connection to U.S. Highway 280 to improve local mobility and connectivity. The roadway section includes 10-foot paved travel lanes with 2-foot shoulders and approximately 18-foot-wide roadside drainage ditches designed to convey stormwater runoff toward a 36-inch cross-drainage structure located beneath Curve #2. The project also includes the installation of fourteen paved driveway connections and associ · Review the official posting, documents, response instructions, and updates before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on September 8, 2026 at 7:19 AM ET. The government source controls if details change.
- Status
- Open at last verification
- Buyer
- Tattnall County Board Of Commissioners
- Notice reference
- PE-77074-NONST-2027-000000039
- Location
- GA
- Category
- Other
- Deadline
- September 25, 2026 at 10:00 AM ET
- Small-business status
- No restriction confirmed in the public record
- Amendments observed
- 0
- Source
- Georgia procurement office
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step