state opportunity · GA
JD Cope MV/LV Switchgear
Georgia Procurement Registry · Non-State Agency · Dalton Utilities · Government: city · Category: Goods · Purchase type: Non-State Agency · NIGP: 28567 Power Systems Switchgears and Related Accessories / 28569 Misc. Electrical Equipment and Supplies (Not Otherwise Classified) / 69068 Relays, etc. · Buyer: David Keaton · dkeaton@dutil.com · Dalton Utilities is soliciting bids for the design, fabrication, and delivery of electrical equipment for the J.D. Cope Energy Facility, a new 55.6 MW reciprocating-engine generation facility in Whitfield County, Georgia. The scope includes one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, along with required engineering submittals, manufacturer field services, spare parts, special tools, and associated documentation. Please review the attachment for detailed specifications. The projected award date is September 16th, 2026, with a planned delivery date of November 26th, 2027. The Owner reserves the right to award the project · Review the official posting, documents, response instructions, and updates before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on September 8, 2026 at 7:19 AM ET. The government source controls if details change.
- Status
- Open at last verification
- Buyer
- Dalton Utilities
- Notice reference
- PE-75553-NONST-2027-000000062
- Location
- GA
- Category
- Other
- Deadline
- September 11, 2026 at 8:00 AM ET
- Small-business status
- No restriction confirmed in the public record
- Amendments observed
- 0
- Source
- Georgia procurement office
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step