Current notice · state · GA
BID 2027-04 SADIE HEIGHTS FLOOD IMPROVEMENT PROJECT PHASE 2
Georgia Procurement Registry · Non-State Agency · Perry, City Of · Government: city · Category: Construction / Public Works · Purchase type: Non-State Agency · NIGP: 92558 Irrigation; Drainage; Flood Control Engineering / 98814 Erosion Control Services / 98826 Flood Control Services · Buyer: Dan Davis · Ddavis@intse.com · The Flood Improvement Project Phase 2A consists of excavating and grading a portion of the regional inline stormwater pond and improving the drainage channels between Stonegate Trail and Rocky Road. The Phase 2B portion of the pond will be constructed separately by others and will consist of excavating and grading the remaining portion of the pond by the developer of the future Avion Park subdivision. Phase 2A and Phase 2B are anticipated to be constructed concurrently and will require coordination between the City’s contractor and the developer’s contractor. Together, the completed improvements will provide additional flood storage and improve drainage in Sadie Heights and the surrounding a · Review the official posting, documents, response instructions, and updates before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on September 10, 2026 at 10:52 AM ET. The government source controls if details change.
- Stage
- Current notice
- Status
- Current response window open
- Notice type
- Non-State Agency
- Buyer
- Perry, City Of
- Notice reference
- PE-66243-NONST-2027-000000092
- Location
- GA
- Category
- Other
- Response due
- October 16, 2026 at 11:00 AM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Unclear
- Amendments observed
- 0
- Source
- Georgia procurement office
- The stored notice does not publish enough safe small-team evidence.
Do not infer fit from missing data. Review the official scope or build a Contract Blueprint before deciding.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step