state opportunity · GA
POOLER PARKWAY AT BENTON BOULEVARD, MILL CREEK CIRCLE, AND I-95 SOUTHBOUND RAMPS POOLER.
Georgia Procurement Registry · Non-State Agency · Pooler, City Of · Government: city · Category: Construction / Public Works · Purchase type: Non-State Agency · NIGP: 91347 Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps / 91345 Construction, Sewer and Storm Drain / 91350 Construction, Streets, Major and Residential, Including Reconstruction · Buyer: Leon Davenport · tboltllc@gmail.com · The work will include all equipment, materials, supplies, labor, and all other costs associated with construction of approximately 3,725 linear feet of roadway. The roadway includes the modification of a signalized intersections, sidewalks, drainage improvements, installation and maintenance of erosion, sediment and pollution control BMPs and final site stabilization. All work under this contract shall be done in accordance with the Georgia Department of Transportation (GDOT) · Review the official posting, documents, response instructions, and updates before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on September 8, 2026 at 7:20 AM ET. The government source controls if details change.
- Status
- Open at last verification
- Buyer
- Pooler, City Of
- Notice reference
- PE-66418-NONST-2026-000000023
- Location
- GA
- Category
- Other
- Deadline
- October 7, 2026 at 2:00 PM ET
- Small-business status
- No restriction confirmed in the public record
- Amendments observed
- 0
- Source
- Georgia procurement office
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step