Open solicitation · state · IA
26-21 Gre853129D (Greene)
Iowa hosted opportunity · Agriculture and Land Stewardship: Completion Dates: Construction: November 1st, 2027 Seeding: December 15, 2027 (must follow the seeding period) This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 62,120 cubic yards of earthwork, installation of 1,044 square feet of steel sheetpile, Aluminum CMP water control structure, 814 linear feet (LF) of tile installation, 57 LF of Aluminum CMP drawdown pipe, 2 Aluminum CMP inlet risers, 618 tons of riprap, 104. Review the official posting, documents, submission instructions, questions, and addenda before responding.
Verified public facts
What the official source currently shows.
DEE last verified this record on November 24, 2026 at 10:26 AM ET. The government source controls if details change.
- Stage
- Open solicitation
- Status
- Open at last verification
- Notice type
- Solicitation
- Buyer
- Iowa State Government
- Notice reference
- 26-21 Gre853129D (Greene)
- Location
- IA
- Category
- Other
- Deadline
- December 30, 2026 at 4:00 PM ET
- Small-business status
- No restriction confirmed in the public record
- Small-Team Fit
- Unclear
- Amendments observed
- 0
- Source
- Iowa procurement office
- The stored notice does not publish enough safe small-team evidence.
Do not infer fit from missing data. Review the official scope or build a Contract Blueprint before deciding.
DEE verification note
Use the preview to screen—not to submit.
Check the official notice for current dates, documents, eligibility, site visits, amendments, and submission instructions. DEE is an independent business and does not replace the issuing agency.
Your next step